Install & Use:
This strainer should be installed vertically or horizontally. In vertical install, the flow from top to bottom, which is in accordance to arrow flaged; In normal operation, the flow guider valve is in open state. When polution need to be discharged, shut off the flow guider valve and open the discharging valve till water turn to clear. Then shut off the discharging valve and open the guider valve to end the discharging procedure.
In manual operation configuration, the discharging valve is a part provided by user;
In electric operation, the discharging valve(electric drive) and console is provided by factory.
Working Pressure: <=1.6Mpa
WOrking Temp:<=90oC
Pressure loss:<=0.015Mpa
Filter Precision: d=1.2mm
Flange acc. to GB9119.9-88, other spec can comply to customer requirement. |